VE25-100

Performance Specifications

*The appearance, configurations, specifications, and performance parameters presented on this page are based on a specific version and are for reference only; the delivered product will determine the final specifications.

In just over five years since its establishment, the Company has achieved global

2021.06

Shanghai Volant Aerotech Co., Ltd. was established

2022.08

The full-scale technological demonstrator X1 was rolled out

2023.01

The full-scale technological demonstrator X1 completed its maiden flight

2023.09

The full-scale technological demonstrator X1 completed transition flights at the test site. The CAAC East China Regional Administration accepted the VE25-100 Type Certificate application

2024.07

The full-scale technological demonstrator X1 completed full transition flights

2024.10

The first review meeting for the VE25-100 type certification was held

2025.04

The certification basis (G-1) for VE25-100 was established, and the project specific certification plan was signed

2025.05

AC101, the first prototype of the VE25-100 development batch aircraft, was successfully rolled out

2025.07

The VE25 engineering simulator was commissioned

2025.08

AC101 completed the industry's first in-flight ballast test

2025.09

AC101 completed its first unrestricted free flight

2025.10

AC101 completed the industry's first piloted flight

2025.11

AC101 conducted in-flight thrust determination tests

2025.12

The third consolidated VE25-100 airworthiness review meeting was held

2025.12

AC101 completed powerplant wind tunnel testing

2026.03

Full-aircraft wind tunnel testing was completed

2026.05

AC101 Completed China's First Piloted Full Transition Flight

2026.08

VE25-100 Airworthiness Certification Prototype AC102 Was Successfully Rolled Out

2026.10

The Fourth Consolidated VE25-100 Airworthiness Review Meeting Was Held

2026.11

AC102 Completed Its First Piloted Flight